An Expanded Tool for an Excellent Harvest

We are planning on expanding our facilities so that we increase our capacity to:

  • Grow spiritually toward the goal of "every man being mature in Christ" (Colossians 1:28-29)
  • Grow numerically toward the goal of sending out "workers into His harvest" (Matthew 9:37-38), through missions and planting a daughter church (Isaiah 54:1-3, Ephesians 4:11-16)
A groundbreaking was held for Phase One on June 5, 2011, as part of the morning service.


Rev. Paul Connor (far right in picture), the PARBC State Representative, spoke at the groundbreaking.  



Check out our
Facebook page for new pictures of the construction!



View of planned facility from Valley Vista Drive (current building is shown on right side of drawing with planned portico):


View of planned facility from side opposite of Valley Vista Drive (current building is shown on left side of drawing with planned portico):



View of planned facility from front of current building (very similar to current view):



View of planned facility from back of facility (side opposite of current driveway):